We’re so confident in the versatility of U-Liner™, we’d like to show you case histories documenting its success.

         You will need the free Adobe® Acrobat® Reader™ to view these files..

City of Austin Uses New Strategy to Reduce Pipeline Repair Costs The city of Austin, Texas awards pipeline rehabilitation maintenance agreements to contractors to save the city money and expedite repair time. Under the agreement, the contractor receives approval to rehabilitate all lines identified for repair with U-Liner™ for one year.   Read more..

29,000 feet of U-Liner™ Used in Major Rehab Job in Kissimmee, FL Twenty-three thousand feet of 8-inch U-Liner and 6,000 feet of 10-inch U-Liner™ were installed to minimize excessive inflow and infiltration in the city of Kissimmee, Florida. Because the water table is extremely high, installers also had to seal and grout 498 lateral connections.  Complete story..

U-Liner™ Used in Mission Hills Canyon Project The hilly, rugged terrain of Mission Hills, California made it practically impossible to repair steep sloped sewer lines. Since excavation was not possible, U-Liner™ was used to reline the existing pipes without damaging the hilly landscape in this environmentally sensitive area. Complete story..

Fort Robinson Army Base Mandate to Reduce Inflow and Infiltration U-Liner™ is used to repair more than 6,000 linear feet of damaged sewer pipe located beneath pavement, building, historical landmarks, and concrete encasements at historic Fort Robinson Army Base in Little Rock, Arkansas.   Read more..