HydroTech in the News
Underground Construction Magazine Article: Big Sur California 2007
HydroTech in the News
Underground Construction Magazine Article: Big Sur California 2007
HydroTech in the News
Being an authorized installer of Cosmic Top Hat™ Lateral Seal Systems gives HydroTech Inc. the opportunity to spread the news about this great trenchless technology. Two recent projects in California and Utah allowed HydroTech to work with two wastewater districts as they grapple with the challenges of keeping older systems operational. The solution? Quality workmanship, a 50+ year extended life, and a cost effective means of rehabilitation versus replacement.
Lake County Special Districts in California needed two service laterals rehabilitated. Through the cleaning and inspection process, HydroTech’s crew was able to identify previous point repairs which had restricted the laterals to 40-50% of their diameters.
By working with the project engineer an agreement was reached to open them to 100% using air compression so the Top Hat™ seals could be properly installed. A spot repair was added, and Top Hats™ were also installed at 4 additional locations. HydroTech was the prime contractor on this project. Stan Schubert of Lake County Special Districts stated, “I know we will be working together again as we have many more sites which require repair.”
PEC (Planned Engineering and Construction) out of Helena, Montana was selected as the prime contractor for a large sewer rehabilitation project for the Cottonwood Improvement District in Sandy, Utah. They selected HydroTech Inc. as a subcontractor and authorized Top Hat™ installer. Over 4,700 linear feet of sewer line was cleaned, inspected, and lined. Once that phase was completed HydroTech was able to rehabilitate the service lateral connections to the equivalent of new to match the rehabilitation work done on the sewer line.
For more information about the Cosmic Top Hat™ Lateral Sealing System, contact HydroTech by email at sales@htinc.biz or call (775) 575-4100.
Congratulations to Don Parsons and Trevor Card for completing the U.S. Army Corps of Engineers’ class: “Construction Quality Management”
HydroTech Inc. is privileged to have an ambitious team of engineers that has always striven for excellence in their professions.
The course was designed to help contractors to understand more about how to successfully do business with the federal Government, including workshops on Quality Assurance, Quality Control Protocols, and Partnering with the Federal Government, to name a few.
The course was exhaustive in it’s navigation of forms and documents necessary to ensure a smooth working relationship during the performance of federal work.
HydroTech is experienced with doing work for Federal, State, and local governments and municipalities, and draws on it’s 23 years of experience to perform quality projects on time and within budget.
click here to view these certifications.