HydroTech Inc’s Cosmic Top Hat installations in California and Utah

Being an authorized installer of Cosmic Top Hat™ Lateral Seal Systems gives HydroTech Inc. the opportunity to spread the news about this great trenchless technology. Two recent projects in California and Utah allowed HydroTech to work with two wastewater districts as they grapple with the challenges of keeping older systems operational. The solution? Quality workmanship, a 50+ year extended life, and a cost effective means of rehabilitation versus replacement.


Lake County Special Districts in California needed two service laterals rehabilitated. Through the cleaning and inspection process, HydroTech’s crew was able to identify previous point repairs which had restricted the laterals to 40-50% of their diameters.

By working with the project engineer an agreement was reached to open them to 100% using air compression so the Top Hat™ seals could be properly installed. A spot repair was added, and Top Hats™ were also installed at 4 additional locations. HydroTech was the prime contractor on this project. Stan Schubert of Lake County Special Districts stated, “I know we will be working together again as we have many more sites which require repair.”

PEC (Planned Engineering and Construction) out of Helena, Montana was selected as the prime contractor for a large sewer rehabilitation project for the Cottonwood Improvement District in Sandy, Utah. They selected HydroTech Inc. as a subcontractor and authorized Top Hat™ installer. Over 4,700 linear feet of sewer line was cleaned, inspected, and lined. Once that phase was completed HydroTech was able to rehabilitate the service lateral connections to the equivalent of new to match the rehabilitation work done on the sewer line.


For more information about the Cosmic Top Hat™ Lateral Sealing System, contact HydroTech by email at sales@htinc.biz or call (775) 575-4100.

Tags:

Comments are closed.